The specific problems this business faces — each handled by an engine your plan actually includes, not a heuristic.
The battery has to be there when the grid isn't. Avrenix keeps your reserve floor as a hard limit the optimiser can't cross — savings only ever come from surplus above it. Reserve floor enters dispatch as a hard constraint, not a soft penalty.
A data-centre load is high and flat, so the monthly peak is set by short spikes — cooling ramps, workload bursts. PHALANX forecasts them as a range and acts before they set the bill. Distributional peak forecasting on your own load.
Backup generation, storage and grid import have to be scheduled together under one tariff, not by three disconnected controllers. TARSIS solves them as one. Co-optimised across 200+ tariff structures.
Every dollar of demand-charge saving has to be attributable and auditable. Avrenix shows it against your own baseline and Chai explains it in plain language. Validated on your 12-month history first; explained by Chai.